Warning: The magic method VFB_Pro::__wakeup() must have public visibility in /home/petreven/public_html/wp-content/plugins/vfb-pro/vfb-pro.php on line 78

Warning: The magic method VFB_Pro_Form_Display::__wakeup() must have public visibility in /home/petreven/public_html/wp-content/plugins/vfb-pro/public/class-form-display.php on line 51

Warning: Cannot modify header information - headers already sent by (output started at /home/petreven/public_html/wp-content/plugins/vfb-pro/vfb-pro.php:78) in /home/petreven/public_html/wp-includes/feed-rss2.php on line 8
Uncategorized – Petreven https://www.petreven.com Petreven Fri, 17 Jul 2026 16:55:37 +0000 es hourly 1 https://wordpress.org/?v=7.0.2 OPERATIONS BACKUP – Experience in Peru https://www.petreven.com/operations-backup-experience-in-peru/ https://www.petreven.com/operations-backup-experience-in-peru/#_comments Fri, 17 Jul 2026 16:54:21 +0000 https://www.petreven.com/?p=488
OPERATIONS BACKUP - Experience in Peru

JULY 2026
Since the beginning of its operations in Northern Peru in 2006, Petreven Perú S.A. has consolidated a track record as a key drilling contractor. As of 2025, the company has a historical cumulative total of 1,462 successfully drilled wells.

Current contract with the operator UNNA ENERGIA S.A. for the period of January 2025 – December 2026.

As a recent operational indicator, during the 2025 fiscal operating period, the company successfully completed the drilling of 44 commercial wells for the client UNNA Energía S.A., distributed as follows:

• Rig H-109 (Model HH102): 34 wells drilled in a depth range of 2,250 ft to 5,000 ft, in UNNA Energía S.A.’s Lote IV.
• Rig H-201 (Model HH220): 10 wells drilled in a depth range of 4,000 ft to 6,700 ft, in UNNA Energía S.A.’s Lote III.

Currently, drilling campaigns continue in Lote IV and Lote III, respectively:

• Rig H-109 (Model HH102): 22 wells to be drilled. The campaign began in June 2026 in UNNA Energía S.A.’s Lote IV.
To date, 3 out of the 22 scheduled wells have been completed.
• Rig H-201 (Model HH220): 11 wells to be drilled. The campaign began in May 2026 in UNNA Energía S.A.’s Lote III.

To date, 4 out of the 11 scheduled wells have been completed.

We have also carried out a drilling campaign for the operator UNIEnergia ABC S.A.C. between April and May 2026, consisting of 3 wells with the H-109 rig in Lote IX of Northern Peru.

]]>